Before a permit for the moving of a structure shall be issued, the applicant shall notify all utilities having service connections within the building, such as water, electric, gas, sewer and other connections. The applicant shall not be entitled to a permit unless a release is obtained from the utilities stating that their respective service connections and appurtenant equipment such as meters have been removed or sealed and plugged in a safe manner; nor shall a permit be issued until the village clerk shall be satisfied, after receiving a written agreement from the public utility companies concerned and signed by the applicant, that the moving may be accomplished in such a manner as not to create a hazardous condition as a result of the proximity of such public utility installations at the site from which the building is to be moved, the site where it is to be moved or the route to be followed in making the movement, including an agreement for necessary moving or raising of overhead wires which might impede the progress of the movement of such structure. (Comp. Ords. 1987, § 18.008) 7/27/26, 10:12 AM Mayville, MI Code of Ordinances about:blank 53/202 Secs. 22-1—22-30. - Reserved.