Section 14.14
All projects within the Village which go through site plan and/or construction plan review shall be required to submit record drawings. The drawings will need to be reviewed and approved by the Village Engineer prior to final acceptance of the project by the Village of Mayville.
The initial submittals shall be of two (2) sets of black line prints providing the applicable information shown on the checklist below. The minimum scale shall be 1”=50’ and shall bear the seal of a registered professional engineer or surveyor licensed to practice within the State of Michigan. All record lengths and elevations must be labeled as record.
After the record drawings have been approved by the Village Engineer, the applicant shall submit two (2) mylar copies of the approved drawings. A CD shall also be provided which contains a .pdf version of each sheet of the plan set with the following attributes.
Locations shall be shown on the plans in State Plane coordinates using the NAD83 Michigan South zone.
Individual pipe sizes and structure types should be on separate layers.
The scale shall be 1:1.
Annotation should be snapped to the mid-point of lines. Lines should be snapped to the center of structures.