1. Plans and specifications for parking and loading areas shall be submitted to the Village President prior to the issuance of a building permit. These plans shall at a minimum:

    1. Show existing and proposed grades.

    2. Be designed to ensure that stormwater runoff shall be accommodated on-site through approved drainage facilities, including catch basins, runoff calculations, pipe sizes and connections to existing drainage structures.

    3. Provide specifications on surface and base materials to be used for construction.

  2. Required parking lots shall be installed and completed within six (6) months of receipt of a building permit and before issuance of an occupancy permit. The Village President may grant a single extension for an additional six (6) months in the event of adverse weather conditions or unusual delays beyond the control of the property owner.

  1. All parking areas shall be maintained free of dust, trash, and debris. Surfacing, curbing, lighting fixtures, signs, and related appurtenances shall be maintained in good condition.

  2. The visibility of pavement markings delineating parking spaces and directional control shall be maintained.

  3. All off-street parking and loading facilities required by this Article shall be maintained free of accumulated snow or standing water which prevent full use and occupancy of such facilities, except for temporary periods of no more than five (5) days in the event of heavy rainfall or snowfall.